Tuesday, July 13, 2010

Wheel Maintenance

Disassembled and inspected left main wheel, replaced tube, re-packed bearings. Also replaced front canopy microswitch.

Thursday, June 24, 2010

Throttle body & controls / Intake Filter

While the throttle body was off to install the stainless box for the firewall, I took the opportunity to modify the throttle cable bracket to reduce the amount of angle placed on the mixture control cable.  It previously had enough angle to cause some stiffness in the controls.  Hooked everything back up, tried it out, and it works perfectly now.









Also finished cleaning up the intake filter assembly, which is all ready minus a few bolts I need to order.

Monday, June 21, 2010

Firewall

Finished fabricating the stainless box for the firewall and mounted it up.  Had to take off the throttle body to get it in there, and it still wasn't easy at that. 

Saturday, June 19, 2010

EIS Sensors

Finished installing MAP sensor for the engine monitor, and MAP advance sensor for the electronic ignition.

Tuesday, June 15, 2010

Wheel maintenance

Regreased right main wheel bearings, installed new tube, reinstalled tire, torqued everything to spec, and finished reinstalling on plane.

Monday, June 14, 2010

Wheel Maintenance

Took apart right main wheel to replace tube, and found corrosion.  Cleaned up the corrosion and repainted I/A/W Cleveland manual.

Saturday, June 05, 2010

Misc

Installed oil dipstick tube, cut dipstick to fit and filed off old oil level lines. Fabricated, primed, and painted rear control stick.

Thursday, June 03, 2010

Control System

Spent the whole night fitting and installing the control system. Still not quite done.

Wednesday, June 02, 2010

Engine and Controls


Finished modifying oil filler tube to fit under cowl. Finished glasswork on intake scoop. Started re-fabricating missing pieces to control system.

Saturday, May 29, 2010

Oil dipstick

Trimmed down the oil dipstick so that it will fit under the cowl. Also got the intake scoop ready for glassing a wall in the back of it. (It was going to be attached to the oil cooler, the cooler didn't fit)

Wednesday, May 26, 2010

SD-8 Wiring

Finished wiring up all the components for the SD-8 backup alternator.

Monday, May 24, 2010

Wiring

Finished wiring up the lr3c voltage regulator.  Mounted all the components for the sd8 backup alternator.

Thursday, May 20, 2010

Wiring

Got half of the wiring for the voltage regulator finished.

Tuesday, May 11, 2010

Wiring

Finished wiring for starter and alternator feeds.

Saturday, May 08, 2010

Ignition timing

Installed and timed magneto and electronic ignition pickup.  Also installed prop (makes it much easier to turn over the engine for timing).

Thursday, May 06, 2010

Throttle cable hookup

Finished hooking up and adjusting the throttle cables.

Wednesday, April 21, 2010

Throttle Cable Bracket

Fabricated bracket for mounting throttle cable to on the engine side.

Tuesday, April 20, 2010

Brakes

Bled the brakes and hooked up the brake pedals.

Monday, April 19, 2010

Front wheel maintenance

Installed new tire and tube on front wheel and cleaned and re-greased bearings.

Wednesday, April 14, 2010

Fuel Vent Manifold

Finished installing and plumbing the fuel vent manifold.