The fuel lines needed a little more support between the sump and fuel selector valve, so I made quick bracket, flexed it in place, and secured the lines with adel clamps.
Monday, February 22, 2016
Fuel Line Support
The fuel lines needed a little more support between the sump and fuel selector valve, so I made quick bracket, flexed it in place, and secured the lines with adel clamps.
Tuesday, February 09, 2016
Friday, January 22, 2016
ELT Installation
Got the ELT all mounted up. Had to place it in between the legs of the back seat passenger.
Saturday, January 09, 2016
Panel Overlay
Got the panel overlay laser cut and engraved by Martian Laser in San Diego. It's made from a 1/8" reverse laser mark sheet of plastic made by Rowmark. I used split electrode electroluminescent sheet from LuminousFilm to produce the backlighting. I drafted everything up in autocad before getting all the pieces cut.





Gutted a cheap PWM dimmer I found on Amazon to provide dimming for the electroluminescent film. This is what the vendor said to do to provide remote dimming with a rheostat.





Gutted a cheap PWM dimmer I found on Amazon to provide dimming for the electroluminescent film. This is what the vendor said to do to provide remote dimming with a rheostat.

Sunday, November 08, 2015
Aileron Balancing
Elevator Balancing
Wednesday, November 04, 2015
Sunday, October 18, 2015
Plenum Cover Gasket
Monday, October 12, 2015
Autopilot Servo Installation
Saturday, October 03, 2015
Electric Landing Light Extension
Hooked up a Pololu servo controller with the landing light to automatically extend the light when you turn it on.
Monday, September 07, 2015
Nose Gear Console
Sunday, August 23, 2015
Indicator System
Sunday, June 28, 2015
Cable Management
Friday, June 26, 2015
Canopy Hardware Fabrication & Installation
Tuesday, June 23, 2015
Rough Idle Troubleshooting
Spent some considerable time troubleshooting a rough/loping low idle. Ran fuel flow tests, cleaned all the fuel injector nozzles, checked for bubbles in the fuel line from the fuel pump to the flow divider, inspected all plugs, and replaced all ignition cables on electronic ignition side. Traced it down to the vacuum advance on the electronic ignition. At low idle, the high vacuum was sensitive to the pulses from the cylinder cycle since the vacuum port is so close to the intake valve on the cylinder. Ordered a .004" Snubber from McMaster Carr and put that right on the vacuum sensor port, and the idle smoothed right out.
Tuesday, June 09, 2015
First Engine Run
Monday, June 08, 2015
Heat Shield
Made a heat shield to protect the throttle and mixture cables from the exhaust, as well as keep the fuel servo and firewall cool. Made it out of .022 6061 and used the adhesive backed Zircoflex III over it.
Saturday, April 25, 2015
Oil Cooler Hoses
Re-made the oil cooler hoses to accommodate the new oil cooler location and made a few brackets to secure them and the throttle cables.
Subscribe to:
Posts (Atom)